Building Demolition sounds echo throughout the Bloor and Yonge Condo Corridor Canyon
They have been at this since November
Still Drilling . Still LOUD at 7:25 a.m.
Toronto Friday March 16 2012
[blackbirdpie url=”https://twitter.com/#!/HiMYSYeD/status/180619839822508032″]